OLYMPUS DIGITAL CAMERA
RJR Construction Inc.

Services

  • Water lines
  • Sewer lines
  • Drainage
  • Lift stations
  • Structural repairs
  • Other civil projects
Services 2

Past Projects

General Contractor: RJR Construction Inc.

Project Name: Upgrade of Sewage Pump Station 530

Project Number: RPQ T2375

Final Contract Amount: $1,100,000.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Kevin Keane

Date Completed: Mar-19

Project Description: Furnishing and Installing all labor, materials and equipment to upgrade Sewage Pump Station. Provide and monitor 24/7 by-pass of station, remove all electrical components, demolish existing 23' deep dry well and wet well, Ins tall new 8' diameter x 22' wet well, new pumps & piping, new electrical control panel and approx. 100' of 8" force main.

General Contractor: RJR Construction Inc.

Project Name: Upgrade of Sewage Pump Station 870

Project Number: RPQ T2304

Final Contract Amount: $663,680.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Kevin Keane

Date Completed: Jul-18

Project Description: Furnishing and Installing all labor, materials and equipment to upgrade Sewage Pump Station. Provide and monitor 24/7 by-pass of station, remove all electrical components, demolish all piping, electrical components, remove existing valve vault, modify existing wet well provide new coating, install new pumps & piping, new electrical control panel .

General Contractor: RJR Construction Inc.

Project Name: Install of West Water Meter on 20" DI WM In Old Port Blvd.

Project Number: RPQ T 2098

Final Contract Amount: $279,037.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Roger Batiste

Date Completed: 10/1/2018

Project Description: Demolish existing 20" meter and meter vault. Install new 20" Mag. Meter and vault, RTU and Electrical Panel.

General Contractor: RJR Construction Inc.

Project Name: Upgrade of Sewage Pump Station 370

Project Number: RPQ T2300

Final Contract Amount: $958,843.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Ernest Cano

Date Completed: Nov-18

Project Description: Furnishing and Installing all labor, materials and equipment to upgrade Sewage Pump Station. Provide and monitor 24/7 by-pass of station, remove all electrical components, demolish existing 23' deep dry well and wet well, Ins tall new 8' diameter x 22' wet well, new pumps & piping, new electrical control panel and approx. 1100' of 8" force main. Full lane road restoration. etc..

General Contractor: RJR Construction Inc.

Project Name: Install 8" DI Force Main.

Project Number: RPQ T2188

Final Contract Amount: $446,557.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Carlos Lopez, P.E.

Date Completed: 8/8/18

Project Description: Install Approximately 1200' of DI Force Main. Install canal crossing, road restoration, abandon existing FM. Connect to new FM to existing Pump Station.

General Contractor: RJR Construction Inc.

Project Name: Furnish and Install 8" DIP Water Main

Project Number: RPQ T1989

Final Contract Amount: $362,315.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Carlos Barro

Date Completed: 2016-11-14

Project Description: Install Approximately 2100' of 8" DI water main, and water services

General Contractor: PCL Construction Services, Inc.

Sub-Contractor: RJR Construction Inc.

Project Name Project No: 592500060003, Miami Metro Zoo, Florida Exhibit and Front Entrance,

Project Number: Bid Package 02B Earthwork and Utilities

Final Contract Amount: $1,216,767.00

Owner: Miami Dade Parks and Recreation Dept.

Project Manger: Eduardo Vilchez

Date Completed: April 29,2016

Project Description: ".02315 Trenching and Backfilling for Piping System

  • 02536 Precast Manholes and Covers
  • 02620 Manhole Frame Sealing System
  • 02625 Sanitary Sewer Manhole Infiltration Insert
  • 13220 PVC/CPVC Pipe and Fitting
  • UC-075 Water Service Installation Section
  • UC-080 Meter Boxes Sectional Plates and Vaults for Water Service Section
  • UC-170 Cleaning and testing of Main Section
  • UC-175 Disinfection of Water Main Section
  • UC-250 Gravity Sewer Systems Section
  • UC-300 Gravity Sewer Pipe Foundation Section
  • UC-310 Gravity Sewer Service Laterals

General Contractor: RJR Construction Inc.

Project Name: Upgrade Pump Station 86

Project Number: RPQ T1537

Final Contract Amount: $385,248.00

Owner: Miami Dade Water and Sewer Dept.

Project Manger: Dalia Abrahante,R.A.

Date Completed: 1/6/2014

Project Description: Refurbishing of lift station. New pumps, electric panel, Generator, New Drive-way.